Folgen
Baoling Guo
Baoling Guo
PhD, HES-SO, Valais, Switzerland
Bestätigte E-Mail-Adresse bei hevs.ch
Titel
Zitiert von
Zitiert von
Jahr
Generalized integrator-extended state observer with applications to grid-connected converters in the presence of disturbances
B Guo, S Bacha, M Alamir, A Hably, C Boudinet
IEEE Transactions on Control Systems Technology 29 (2), 744-755, 2020
1002020
A review on ADRC based PMSM control designs
B Guo, S Bacha, M Alamir
IECON 2017-43rd annual conference of the IEEE industrial electronics society …, 2017
872017
LADRC applied to variable speed micro-hydro plants: Experimental validation
B Guo, S Bacha, M Alamir, A Mohamed, C Boudinet
Control Engineering Practice 85, 290-298, 2019
542019
Smart charging impact on electric vehicles in presence of photovoltaics
K Hajar, B Guo, A Hably, S Bacha
2021 IEEE International Conference on Industrial Technology (ICIT), 2021
292021
Energetic simulation of DC railway micro-grid interconnecting with PV solar panels, EV charger infrastructures and electrical railway network
J Pouget, B Guo, L Bossoney, J Coppex, D Roggo, C Ellert
2020 IEEE Vehicle Power and Propulsion Conference (VPPC), 1-7, 2020
242020
Variable speed micro-hydro power generation system: Review and Experimental results
B Guo, S Bacha, M Alamir, AT Mohamed
Symposium de Génie Electrique, 2018
242018
Variable speed micro-hydro power plant: modelling, losses analysis, and experiment validation
B Guo, A Mohamed, S Bacha, M Alamir
2018 IEEE International Conference on Industrial Technology (ICIT), 1079-1084, 2018
242018
An anti-disturbance ADRC based MPPT for variable speed micro-hydropower plant
B Guo, S Bacha, M Alamir, H Imanein
IECON 2017-43rd Annual Conference of the IEEE Industrial Electronics Society …, 2017
202017
基于二阶广义积分器-锁频环的异步电机同步角频率估计方法
辛振, 赵仁德, 郭宝玲, 马帅
电工技术学报 29 (1), 116-122, 2014
152014
基于双二阶广义积分器–锁频环的异步电机同步角频率估计方法
辛振, 赵仁德, 陈晨, 郭宝玲
中国电机工程学报 34 (27), 4676-4682, 2014
112014
A Robust LESO-based DC-Link Voltage Controller for Variable Speed Hydro-Electric Plants
B Guo, S Bacha, M Alamir, H Imaneini
2019 IEEE International Conference on Industrial Technology (ICIT), 361-366, 2019
102019
A phase-locked loop using ESO-based loop filter for grid-connected converter: performance analysis
B Guo, S Bacha, M Alamir, J Pouget
Journal Control Theory and Technology, 1-15, 2021
92021
Reduced-Scale Models of Variable Speed Hydro-Electric Plants for Power Hardware-in-the-Loop Real-Time Simulations
B Guo, A Mohamed, S Bacha, M Alamir, C Boudinet, J Pouget
Energies 13 (21), 1-22, 2020
92020
Online forecasting of electrical load for distributed management of plug-in electric vehicles
K Basu, A Ovalle, B Guo, A Hably, S Bacha, K Hajar
2016 3rd International Conference on Renewable Energies for Developing …, 2016
92016
An enhanced phase-locked loop with extended state observer
B Guo, S Bacha, M Alamir, C Boudinet, H Mesnage
2019 20th International Symposium on Power Electronics (Ee), 1-6, 2019
82019
Voltage regulations solutions for low voltage distribution network with large PVs integration: performance analysis with a real Swiss case
B Guo, L Pignat, J Pouget, N Jordan, D Blatter, G Köppel
IET Digital Library, 27th International Conference on Electricity …, 2023
32023
Modelling and advanced controls of variable speed hydro-electric plants
B Guo
University Grenoble Alpes, 2019
32019
Optimal Management of Variable Speed Pumped-Storage Hydro-Electric Plant: Cases Study
B Guo, S Bacha, M Alamir, A Villamil
2019 IEEE International Conference on Industrial Technology (ICIT), 1119-1125, 2019
32019
Circulating current suppression for a direct AC-AC modular multilevel converter in YDY coupling
A Dasco, S Bacha, B Raison, B Guo
IECON 2017-43rd Annual Conference of the IEEE Industrial Electronics Society …, 2017
32017
Potential analysis for vacuum transport technologies in public transport in Switzerland: Life-cycle analysis with focus on energy consumption and environmental impact of a …
G Pareschi, J Ehwald, N Leng, P Beckert, B Guo
Federal Office of Transport FOT: Bern, Switzerland, 2023
22023
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20