Significant factors causing delay in the UAE construction industry AS Faridi, SM El‐Sayegh Construction management and economics 24 (11), 1167-1176, 2006 | 945 | 2006 |
Risk assessment and allocation in the UAE construction industry SM El-Sayegh International journal of project management 26 (4), 431-438, 2008 | 703 | 2008 |
Risk assessment and allocation in highway construction projects in the UAE SM El-Sayegh, MH Mansour Journal of management in Engineering 31 (6), 04015004, 2015 | 269 | 2015 |
A critical review of 3D printing in construction: Benefits, challenges, and risks S El-Sayegh, L Romdhane, S Manjikian Archives of Civil and Mechanical Engineering 20, 1-25, 2020 | 223 | 2020 |
Risk identification and assessment in sustainable construction projects in the UAE SM El-Sayegh, S Manjikian, A Ibrahim, A Abouelyousr, R Jabbour International Journal of Construction Management 21 (4), 327-336, 2021 | 123 | 2021 |
Evaluating supplier selection criteria for oil and gas projects in the UAE using AHP and Delphi B Luzon, SM El-Sayegh International Journal of Construction Management 16 (2), 175-183, 2016 | 108 | 2016 |
Cost optimization model for the multiresource leveling problem with allowed activity splitting M Hariga, SM El-Sayegh Journal of construction engineering and management 137 (1), 56-64, 2011 | 88 | 2011 |
Prioritizing risks in sustainable construction projects using a risk matrix-based Monte Carlo Simulation approach A Qazi, A Shamayleh, S El-Sayegh, S Formaneck Sustainable Cities and Society 65, 102576, 2021 | 81 | 2021 |
Causes of claims in road construction projects in the UAE M Mishmish, SM El-Sayegh International Journal of Construction Management 18 (1), 26-33, 2018 | 79 | 2018 |
Float consumption impact on cost and schedule in the construction industry ZI Sakka, SM El-Sayegh Journal of Construction Engineering and Management 133 (2), 124-130, 2007 | 76 | 2007 |
Project risk management practices in the UAE construction industry SM El-Sayegh International Journal of Project Organisation and Management 6 (1-2), 121-137, 2014 | 70 | 2014 |
Critical review of the evolution of project delivery methods in the construction industry S Ahmed, S El-Sayegh Buildings 11 (1), 11, 2020 | 64 | 2020 |
Key contractor selection criteria for green construction projects in the UAE SM El-Sayegh, M Basamji, A Haj Ahmad, N Zarif International Journal of Construction Management 21 (12), 1240-1250, 2021 | 58 | 2021 |
Time–cost optimization model considering float-consumption impact RA Al Haj, SM El-Sayegh Journal of Construction Engineering and Management 141 (5), 04015001, 2015 | 56 | 2015 |
Construction disputes in the UAE: Causes and resolution methods S El-Sayegh, I Ahmad, M Aljanabi, R Herzallah, S Metry, O El-Ashwal Buildings 10 (10), 171, 2020 | 53 | 2020 |
Multi‐criteria decision support model for selecting the appropriate construction management at risk firm SM El‐Sayegh Construction Management and Economics 27 (4), 385-398, 2009 | 50 | 2009 |
Assessment of the design–construction interface problems in the UAE MH AL Mousli, SM El-Sayegh Architectural Engineering and Design Management 12 (5), 353-366, 2016 | 47 | 2016 |
Competency domain model and the perception of engineering managers in the United Arab Emirates HS El-Baz, SM El-Sayegh Engineering management journal 22 (1), 3-12, 2010 | 38 | 2010 |
Identification and assessment of sustainability performance indicators for construction projects S Rajabi, S El-Sayegh, L Romdhane Environmental and Sustainability Indicators 15, 100193, 2022 | 36 | 2022 |
Project selection using the combined approach of AHP and LP F Parvaneh, SM El-Sayegh Journal of Financial Management of Property and Construction 21 (1), 39-53, 2016 | 34 | 2016 |