Folgen
David Chua Kim Huat
David Chua Kim Huat
Bestätigte E-Mail-Adresse bei nus.edu.sg
Titel
Zitiert von
Zitiert von
Jahr
Critical success factors for different project objectives
DKH Chua, YC Kog, PK Loh
Journal of construction engineering and management 125 (3), 142-150, 1999
11411999
Construction resource scheduling with genetic algorithms
WT Chan, DKH Chua, G Kannan
Journal of construction engineering and management 122 (2), 125-132, 1996
3651996
Key factors in bid reasoning model
DKH Chua, D Li
Journal of Construction Engineering and Management 126 (5), 349-357, 2000
3062000
BIM-based Last Planner System tool for improving construction project management
D Heigermoser, BG de Soto, ELS Abbott, DKH Chua
Automation in Construction 104, 246-254, 2019
2422019
Case-based reasoning approach in bid decision making
DKH Chua, DZ Li, WT Chan
Journal of construction engineering and management 127 (1), 35-45, 2001
2362001
Incident causation model for improving feedback of safety knowledge
DKH Chua, YM Goh
Journal of construction engineering and management 130 (4), 542-551, 2004
2212004
Moving element method for train‐track dynamics
CG Koh, JSY Ong, DKH Chua, J Feng
International Journal for Numerical Methods in Engineering 56 (11), 1549-1567, 2003
1732003
Model for construction budget performance—Neural network approach
DKH Chua, YC Kog, PK Loh, EJ Jaselskis
Journal of Construction Engineering and Management 123 (3), 214-222, 1997
1711997
Design-for-safety knowledge library for BIM-integrated safety risk reviews
MA Hossain, ELS Abbott, DKH Chua, TQ Nguyen, YM Goh
Automation in Construction 94, 290-302, 2018
1542018
Neural network analysis of construction safety management systems: A case study in Singapore
YM Goh, D Chua
Construction Management and Economics 31 (5), 460-470, 2013
1522013
Use of a WBS matrix to improve interface management in projects
DK Chua, M Godinot
Journal of construction engineering and management 132 (1), 67-79, 2006
1412006
Potential applications of UAV along the construction's value chain
QFM Dupont, DKH Chua, A Tashrif, ELS Abbott
Procedia Engineering 182, 165-173, 2017
1362017
Key determinants for construction schedule performance
YC Kog, DKH Chua, PK Loh, EJ Jaselskis
International Journal of project management 17 (6), 351-359, 1999
1331999
Case-based reasoning approach to construction safety hazard identification: Adaptation and utilization
YM Goh, DKH Chua
Journal of Construction Engineering and Management 136 (2), 170-178, 2010
1242010
Case-based reasoning for construction hazard identification: Case representation and retrieval
YM Goh, DKH Chua
Journal of Construction Engineering and Management 135 (11), 1181-1189, 2009
1152009
Integrated prefabrication configuration and component grouping for resource optimization of precast production
A Khalili, DK Chua
Journal of Construction Engineering and Management 140 (2), 04013052, 2014
1092014
Interface management for China’s build–operate–transfer projects
WT Chan, C Chen, JI Messner, DK Chua
Journal of Construction Engineering and Management 131 (6), 645-655, 2005
1032005
Steady-state vibration of subway-soil-building system
T Balendra, KH Chua, KW Lo, SL Lee
Journal of engineering mechanics 115 (1), 145-162, 1989
1031989
Impacts of obstacles in East Asian cross-border construction
DKH Chua, Y Wang, WT Tan
Journal of construction engineering and management 129 (2), 131-141, 2003
982003
Groundborne vibrations due to trains in tunnels
KH Chua, T Balendra, KW Lo
Earthquake engineering & structural dynamics 21 (5), 445-460, 1992
961992
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20