Critical success factors for different project objectives DKH Chua, YC Kog, PK Loh Journal of construction engineering and management 125 (3), 142-150, 1999 | 1141 | 1999 |
Construction resource scheduling with genetic algorithms WT Chan, DKH Chua, G Kannan Journal of construction engineering and management 122 (2), 125-132, 1996 | 365 | 1996 |
Key factors in bid reasoning model DKH Chua, D Li Journal of Construction Engineering and Management 126 (5), 349-357, 2000 | 306 | 2000 |
BIM-based Last Planner System tool for improving construction project management D Heigermoser, BG de Soto, ELS Abbott, DKH Chua Automation in Construction 104, 246-254, 2019 | 242 | 2019 |
Case-based reasoning approach in bid decision making DKH Chua, DZ Li, WT Chan Journal of construction engineering and management 127 (1), 35-45, 2001 | 236 | 2001 |
Incident causation model for improving feedback of safety knowledge DKH Chua, YM Goh Journal of construction engineering and management 130 (4), 542-551, 2004 | 221 | 2004 |
Moving element method for train‐track dynamics CG Koh, JSY Ong, DKH Chua, J Feng International Journal for Numerical Methods in Engineering 56 (11), 1549-1567, 2003 | 173 | 2003 |
Model for construction budget performance—Neural network approach DKH Chua, YC Kog, PK Loh, EJ Jaselskis Journal of Construction Engineering and Management 123 (3), 214-222, 1997 | 171 | 1997 |
Design-for-safety knowledge library for BIM-integrated safety risk reviews MA Hossain, ELS Abbott, DKH Chua, TQ Nguyen, YM Goh Automation in Construction 94, 290-302, 2018 | 154 | 2018 |
Neural network analysis of construction safety management systems: A case study in Singapore YM Goh, D Chua Construction Management and Economics 31 (5), 460-470, 2013 | 152 | 2013 |
Use of a WBS matrix to improve interface management in projects DK Chua, M Godinot Journal of construction engineering and management 132 (1), 67-79, 2006 | 141 | 2006 |
Potential applications of UAV along the construction's value chain QFM Dupont, DKH Chua, A Tashrif, ELS Abbott Procedia Engineering 182, 165-173, 2017 | 136 | 2017 |
Key determinants for construction schedule performance YC Kog, DKH Chua, PK Loh, EJ Jaselskis International Journal of project management 17 (6), 351-359, 1999 | 133 | 1999 |
Case-based reasoning approach to construction safety hazard identification: Adaptation and utilization YM Goh, DKH Chua Journal of Construction Engineering and Management 136 (2), 170-178, 2010 | 124 | 2010 |
Case-based reasoning for construction hazard identification: Case representation and retrieval YM Goh, DKH Chua Journal of Construction Engineering and Management 135 (11), 1181-1189, 2009 | 115 | 2009 |
Integrated prefabrication configuration and component grouping for resource optimization of precast production A Khalili, DK Chua Journal of Construction Engineering and Management 140 (2), 04013052, 2014 | 109 | 2014 |
Interface management for China’s build–operate–transfer projects WT Chan, C Chen, JI Messner, DK Chua Journal of Construction Engineering and Management 131 (6), 645-655, 2005 | 103 | 2005 |
Steady-state vibration of subway-soil-building system T Balendra, KH Chua, KW Lo, SL Lee Journal of engineering mechanics 115 (1), 145-162, 1989 | 103 | 1989 |
Impacts of obstacles in East Asian cross-border construction DKH Chua, Y Wang, WT Tan Journal of construction engineering and management 129 (2), 131-141, 2003 | 98 | 2003 |
Groundborne vibrations due to trains in tunnels KH Chua, T Balendra, KW Lo Earthquake engineering & structural dynamics 21 (5), 445-460, 1992 | 96 | 1992 |