Folgen
Alain HAIT
Titel
Zitiert von
Zitiert von
Jahr
The energy scheduling problem: Industrial case-study and constraint propagation techniques
C Artigues, P Lopez, A Haït
International Journal of Production Economics 143 (1), 13-23, 2013
1262013
Project scheduling under uncertainty using fuzzy modelling and solving techniques
M Masmoudi, A Hait
Engineering Applications of Artificial Intelligence 26 (1), 135-149, 2013
1122013
Integrated production and utility system approach for optimizing industrial unit operations
MH Agha, R Thery, G Hetreux, A Hait, JM Le Lann
Energy 35 (2), 611-627, 2010
1092010
On electrical load tracking scheduling for a steel plant
A Hait, C Artigues
Computers & Chemical Engineering 35 (12), 3044-3047, 2011
662011
Gestion de production et ressources humaines: méthodes de planification dans les systèmes productifs
P Baptiste
Presses inter Polytechnique, 2005
512005
Motion planning on rough terrain for an articulated vehicle in presence of uncertainties
A Hait, T Simeon
Proceedings of IEEE/RSJ International Conference on Intelligent Robots and …, 1996
511996
A hybrid CP/MILP method for scheduling with energy costs
A Hait, C Artigues
European Journal of Industrial Engineering 5 (4), 471-489, 2011
462011
Robust motion planning for rough terrain navigation
A Haït, T Siméon, M Taïx
Proceedings 1999 IEEE/RSJ International Conference on Intelligent Robots and …, 1999
401999
A rough-cut capacity planning model with overlapping
G Baydoun, A Haït, R Pellerin, B Clément, G Bouvignies
OR spectrum 38, 335-364, 2016
362016
Algorithms for rough terrain trajectory planning
A Haït, T Simeon, M Taïx
Advanced Robotics 16 (8), 673-699, 2002
272002
Scheduling under energy constraints
C Artigues, P Lopez, A Haït
International Conference on Industrial Engineering and Systems Management …, 2009
252009
A novel solution approach with ML-based pseudo-cuts for the Flight and Maintenance Planning problem
F Peschiera, R Dell, J Royset, A Haït, N Dupin, O Battaïa
OR Spectrum 43, 635-664, 2021
222021
The extended resource task network: a framework for the combined scheduling of batch processes and CHP plants
R Théry, G Hetreux, MH Agha, A Haït, JM Le Lann
International Journal of Production Research 50 (3), 623-646, 2012
182012
Fuzzy uncertainty modelling for project planning: application to helicopter maintenance
M Masmoudi, A Haït
International journal of production research 50 (13), 3594-3611, 2012
162012
A new event-based MILP model for the resource-constrained project scheduling problem with variable intensity activities
A Haït, G Baydoun
The IEEE international conference on industrial engineering and engineering …, 2012
152012
Proactive tactical planning approach for large scale engineering and construction projects
K Cherkaoui, P Baptiste, R Pellerin, A Haït, N Perrier
The Journal of Modern Project Management 5 (1), 2017
122017
Long term planning of military aircraft flight and maintenance operations
F Peschiera, O Battaïa, A Haït, N Dupin
arXiv preprint arXiv:2001.09856, 2020
112020
A time driven RCCP model with two levels of planning and a reactive planning approach for tactical project planning
K Cherkaoui, R Pellerin, P Baptiste, A Haït
Procedia Computer Science 64, 257-264, 2015
112015
A GA-based fuzzy resource leveling optimization for helicopter maintenance activity
M Masmoudi, A Haït
Proceedings of the 7th Conference of the European Society for Fuzzy Logic …, 2011
112011
A tactical model under uncertainty for helicopter maintenance planning
M Masmoudi, A Haït
the 8th ENIM IFAC International Conference of Modeling and Simulation, MOSIM …, 2010
112010
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20