Folgen
Professor Jean-Paul Arnaout
Professor Jean-Paul Arnaout
Bestätigte E-Mail-Adresse bei gust.edu.kw
Titel
Zitiert von
Zitiert von
Jahr
Ant colony optimization algorithm to solve for the transportation problem of cross-docking network
R Musa, JP Arnaout, H Jung
Computers & Industrial Engineering 59 (1), 85-92, 2010
2042010
A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times
JP Arnaout, G Rabadi, R Musa
Journal of Intelligent Manufacturing 21, 693-701, 2010
1912010
Exploring the effects of cooperative adaptive cruise control on highway traffic flow using microscopic traffic simulation
GM Arnaout, JP Arnaout
Transportation Planning and Technology 37 (2), 186-199, 2014
1162014
A two-stage Ant Colony optimization algorithm to minimize the makespan on unrelated parallel machines—part II: enhancements and experimentations
JP Arnaout, R Musa, G Rabadi
Journal of Intelligent Manufacturing 25, 43-53, 2014
962014
Optimization of quality and operational costs through improved scheduling of harvest operations
JPM Arnaout, M Maatouk
International Transactions in operational research 17 (5), 595-605, 2010
762010
Ant colony optimization algorithm for the Euclidean location-allocation problem with unknown number of facilities
JP Arnaout
Journal of Intelligent Manufacturing 24, 45-54, 2013
572013
Maximizing the utilization of operating rooms with stochastic times using simulation
JPM Arnaout, S Kulbashian
2008 Winter Simulation Conference, 1617-1623, 2008
482008
A worm optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times
JP Arnaout
Annals of Operations Research 285 (1), 273-293, 2020
422020
ACO for the surgical cases assignment problem
C Rizk, JP Arnaout
Journal of Medical Systems 36, 1891-1899, 2012
422012
Heuristics for the maximization of operating rooms utilization using simulation
JP Arnaout
Simulation 86 (8-9), 573-583, 2010
362010
Ant colony optimization algorithm to parallel machine scheduling problem with setups
JP Arnaout, R Musa, G Rabadi
2008 IEEE international conference on automation science and engineering …, 2008
352008
Rescheduling of parallel machines with stochastic processing and setup times
JP Arnaout
Journal of Manufacturing Systems 33 (3), 376-384, 2014
272014
Rescheduling of unrelated parallel machines under machine breakdowns
JP Arnaout, G Rabadi
International Journal of Applied Management Science 1 (1), 75-89, 2008
272008
Solving the multiple level warehouse layout problem using ant colony optimization
JP Arnaout, C ElKhoury, G Karayaz
Operational Research 20, 473-490, 2020
262020
A dynamic heuristic for the stochastic unrelated parallel machine scheduling problem
JP Arnaout, G Rabadi, JH Mun
International Journal of Operations Research 3 (2), 2006
262006
A practical decentralized access protocol for autonomous vehicles at isolated under-saturated intersections
J Khoury, J Khoury, G Zouein, JP Arnaout
Journal of Intelligent Transportation Systems 23 (5), 427-440, 2019
202019
Port Recovery from Security Incidents: A Simulation Approach, IN: Bichou, Bell & Evans: Risk Management in Port Operations, Logistics and Supply Chain Security.
G Rabadi, CA Pinto, W Talley, JP Arnaout
INFORMA/Lloyd’s List Publishing, London, UK., 2007
16*2007
Worm optimization for the multiple level warehouse layout problem
JP Arnaout
Annals of Operations Research 269 (1), 29-51, 2018
152018
Heuristics for the two‐machine scheduling problem with a single server
JP Arnaout
International Transactions in Operational Research 24 (6), 1347-1355, 2017
142017
Minimizing the total weighted completion time on unrelated parallel machines with stochastic times
JPM Arnaout, G Rabadi
Proceedings of the Winter Simulation Conference, 2005., 7 pp., 2005
132005
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20