Folgen
Farook Hamzeh
Farook Hamzeh
Professor, Civil and Environmental Engineering, University of Alberta
Bestätigte E-Mail-Adresse bei ualberta.ca - Startseite
Titel
Zitiert von
Zitiert von
Jahr
3D concrete printing: machine design, mix proportioning, and mix comparison between different machine setups
Z Malaeb, F AlSakka, F Hamzeh
3D Concrete Printing Technology, 115-136, 2019
3752019
3D Concrete Printing: Machine and Mix Design
Z Malaeb, H Hachem, A Tourbah, T Maalouf, N El Zarwi, FR Hamzeh
375*2015
Rethinking Lookahead Planning to Optimize Construction Workflow
FR Hamzeh, G Ballard, ID Tommelein
Lean construction journal, 15-34, 2012
1812012
Using social network theory and simulation to compare traditional versus BIM–lean practice for design error management
M Al Hattab, FR Hamzeh
Automation in Construction 52 (April 2015), 59-69, 2015
1652015
Is The Last Planner System Applicable to Design? A Case Study
FR Hamzeh, G Ballard, ID Tommelein
Proceedings of the 17th Annual Conference of the International Group for …, 2009
1362009
Improving construction workflow-The role of production planning and control
FR Hamzeh
University of California, Berkeley, 2009
1222009
Logistics centers to support project-based production in the construction industry
FR Hamzeh, ID Tommelein, G Ballard, P Kaminsky
Proceedings of the 15th Annual Conference of the International Group for …, 2007
1142007
Improving construction workflow-the connective role of lookahead planning
FR Hamzeh, G Ballard, ID Tommelein
Proceedings for the 16th annual conference of the International Group for …, 2008
1082008
Exploring associations between resilience and construction safety performance in safety networks
F Wehbe, M Al Hattab, FR Hamzeh
Safety Science 82, 338-351, 2016
922016
Simulating the dynamics of social agents and information flows in BIM-based design
M Al Hattab, F Hamzeh
Automation in Construction 92, 1-22, 2018
882018
How can ‘tasks made ready’ during lookahead planning impact reliable workflow and project duration?
FR Hamzeh, E Zankoul, C Rouhana
Consturction Management and Economics, 2015
872015
Information Flow Comparison Between Traditional and BIM-Based Projects in the Design Phase
M Al Hattab, FR Hamzeh
Proceedings of the 21st Annual Conference of the International Group for …, 2013
832013
Understanding the Role of "Tasks Anticipated" in Lookahead Planning through Simulation
FR Hamzeh, I Saab, ID Tommelein, G Ballard
Automation in Construction 49 (Part A, January), 18-26, 2015
762015
The lean journey: implementing the last planner system in construction
FR Hamzeh
Proceedings of the 19th Annual Conference of the International Group for …, 2011
662011
Application of hands-on simulation games to improve classroom experience
F Hamzeh, C Theokaris, C Rouhana, Y Abbas
European Journal of Engineering Education 42 (5), 471-481, 2017
612017
A vision-based approach for automatic progress tracking of floor paneling in offsite construction facilities
P Martinez, B Barkokebas, F Hamzeh, M Al-Hussein, R Ahmad
Automation in Construction 125, 103620, 2021
582021
Qualitative assessment of interfacial bonding in 3D printing concrete exposed to frost attack
JJ Assaad, F Hamzeh, B Hamad
Case Studies in Construction Materials 13, e00357, 2020
582020
Implementation of IPD in the Middle East and its Challenges
F Rached, Y Hraoui, A Karam, FR Hamzeh
Proceeding of the 22nd Annual Conference of the International Group for Lean …, 2014
582014
Advanced metrics for construction planning
FR Hamzeh, G El Samad, S Emdanat
Journal of Construction Engineering and Management 145 (11), 04019063, 2019
572019
Implementing Takt-Time Planning in Construction to Improve Work Flow
T Yassine, B Basha, F Faek, FR Hamzeh
Proceeding of the 22nd Annual Conference of the International Group for Lean …, 2014
532014
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20